各市成考:
成考系统:

关注公众号

服务时间08:00-24:00

微信公众号

考生交流群

免费课程/题库

微信扫一扫

关闭
所在位置:亳州成考网 > 复习资料 > 学位英语 > 亳州成考学位英语:阅读理解专题练习(1)

亳州成考学位英语:阅读理解专题练习(1)

签到领取培训券,免费领取各类提升课程
2021-12-20 14:57:58 来源: 其它
作者:娄老师
亳州成考网整理“成人高考学位英语考试阅读理解专题练习”,希望给考生带来帮助。

If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million bar-rels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $ 3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe( 部落), is determined to stop the 1,172-mile pipeline from being built. (76)Both sides show no signs of backing down.

The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thou-sands of people, including people from American Indian tribes, have traveled to the site to join the protest.

ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Work-ers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.

American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.

Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.

11.Which of the following is the main idea of the passage?

A.The Dakota Access Pipeline will create more markets for oil and gas.

B.The Dakota Access Pipeline will create many job opportunities.

C.American Indians oppose the construction of an oil pipeline.

D.American Indians fight for equal voting rights.

答案:C

解析: 【定位】第一段第二句话“Energy Transfer Partners…hopes to finish construction this year.”;第三句话“But the Standing Rock Sioux,an Amefican Indian tribe,is determined to stop the 1,172-mile pipefine from being built.”和第四句话“Bom sides show no signs of back-ing down.”。

主旨题。题干问的是“下列哪项表达了本文的大意?”根据定位句第一句“ETP

公司期望在今年内完成输油管道建设”,第三句“立岩苏族决定要中止1172英里长的输油管道的修建”,第四句“双方都没有妥协的迹象”可知双方矛盾所在。A项“达科塔输油管道将为原油和天然气创造更多市场”;B项“达科塔输油管道将创造更多就业机会”;D项“美国印第安人为平等投票权而战”在文中均没有提及。故选C。

12.ETP hopes to finish this project in__________.

A.2016

B.2017

C.2018

D.2019

答案:A

解析:【定位】第一段第二句话“Energy Transfer Partners…hopes to finish construction mis year.”。细节题。题干问的是“ETP公司希望在哪一年完成工程建设?”定位句指出“ETP公司期望在今年内完成输油管道建设”。由于今年是2016年,故选A。

13.Why do American Indians protest against the construction of this pipeline?

A.Because it will cost up to $ 3.8 billion.

B.Because it threatens the region' s water supply.

C.Because it will make many people lose their jobs.

D.Because it will force many people to leave their homes.

答案:B

解析:【定位】第二段第五句话“They also say the pipefine could pollute their main water source, the Missouri River.”。细节题。题干问的是“为什么美国印第安人抗议反对输油管道的建设?”根据定位句“他们同时认为管道可能会污染当地的主要水源——密苏里河”可知,印第安人反对管道建设的一个原因是担心管道会污染水源。A项“因为工程耗资达38亿”,不是印第安人抗议的原因;C项“因为很多人会因此失业”和D项“这将迫使很多人离开家园”均未在文中提及,故选B。

14.According to the passage, the workers can__________ in case of pipeline leaks.

A.report it to the local government

B.ask people to leave the leak affected areas

C.call 911

D.close valves

答案:D

解析:【定位】第三段第二句话“Workers will also monitor it remotely,and will be able to close valves within three minutes if leaks are detected.”。 细节题。题干问的是“根据文章,出现管道泄漏时,工人可以如何应对?”定位句“工人们可以进行远程监控,如果发现有泄露,他们可以在3分钟之内关上阀门。”表明工人可以关闭阀门。A项“向当地政府汇报”;B项“让人们离开泄漏影响地区”;C项“打电话给911”,均未在文中提及。故选D。

15.According to the passage, which of the following statements is NOT TRUE?

A.This pipeline will cross four states.

B.This pipeline is 1,179. miles long.

C.All the protesters are from the Standing Rock Sioux.

D.Neither side of the dispute is willing to compromise.

答案:C

解析:【定位】第一段第一句话“If the Dakota Access Pipeline is completed,it will carry nearly half a million barrels of oil across four states every day.”;第一段第三句话“But the Standing Rock Sioux,an American Indian tribe,is determined to stop the 1,172-mile pipeline from be-ing built.”;第二段最后一句话“Since then,thousands of people,including people from other American Indian tribes,have Raveled to the site to join the protest.”;第一段最后一句话“Both sides show no signs of backing down.”。

综合分析题。题干问的是“根据文章,下列哪个表述不正确?”根据定位句分别得出四个选项:A项“如果达科塔输油管道完工,每天近50万桶原油将跨越四个州进行输送。”;B项“立岩苏族决定要中止1172英里长的输油管道的修建”;C项“此后,几千人,包括美国其他印第安部落的人们纷纷来到工地加入抗议大军。”;D项“双方都没有表示妥协的迹象。”。A、B、D三个选项均符合文中表述,只有C项不完全符合,故选C。

成人高考院校专业指导专属提升方案

获取方案 OR 点我咨询 点我关注 点我加群

未经授权不得转载,如需转载请注明出处。

转载请注明:文章转载自 其它
本文关键词: 亳州成考学位英语   阅读理解   专题练习  
本文地址:http://www.bzydf.com/show-244-3035-1.html

亳州成考网申明:

(一)由于各方面情况的调整与变化本网提供的考试信息仅供参考,敬请以教育考试院及院校官方公布的正式信息为准。

(二)本网注明信息来源为其他媒体的稿件均为转载体,免费转载出于非商业性学习目的,版权归原作者所有。如有内容与版权问题等请与本站联系。联系方式:邮件429504262@qq.com

上一篇:亳州成考学位英语:历年真题高频词汇(2)

下一篇:亳州成考学位英语:阅读理解专题练习(2)

课程相关图片

2022年成考VIP直播班

讲师:张老师、周老师、何老师、缪老师、雷老师、吴老师、杨老师

特色:名师辅导3阶段系统教学,4项纸质版配套资料赠送,实力考证

立即报名 班级详情>>
新用户注册即送500培训券。 注:1积分=1培训券 立即注册
培训券
课程名称 课程 讲师 查看课程
2021年亳州成人高考高起点史地考情分析 张老师 36课时 查看详情
2021年亳州成人高考高起点数学考情分析 周老师 36课时 查看详情
2021年亳州成人高考高起点英语考情分析 何老师 36课时 查看详情
2021年亳州成人高考高起点语文考情分析 缪老师 36课时 查看详情
2021年亳州成人高考专升本大学语文考情分析 雷老师 36课时 查看详情
2021年亳州成人高考专升本英语考前分析 吴老师 36课时 查看详情
2021年亳州成人高考专升本艺术概论考前分析 杨老师 36课时 查看详情
课程相关图片

2022年成考VIP班

讲师:张老师、周老师、何老师、缪老师、雷老师、吴老师、杨老师

特色:名师辅导3阶段系统教学,4项纸质版配套资料赠送,实力考证

立即报名 班级详情>>
新用户注册即送500培训券。 注:1积分=1培训券 立即注册
培训券
课程名称 课程 讲师 查看课程
高起专VIP班 蒋老师 36课时 查看详情
专升本(文史类)VIP班 蒋老师 36课时 查看详情
高起本VIP班 蒋老师 36课时 查看详情
专升本(农学类)VIP班 蒋老师 36课时 查看详情
专升本(艺术类)VIP班 蒋老师 36课时 查看详情
专升本(教育类)VIP班 蒋老师 36课时 查看详情
专升本(经管类、理工类)VIP班 蒋老师 36课时 查看详情

优质老师授课

专业教学体系

高性价比课程

7天保障畅学无忧

亳州成考网选课中心

【成考课程学习中心】

在线模拟答题 我的课程
  • 考生交流群

  • 微信公众号

扫一扫加入微信交流群

与考生自由互动、并且能直接与专业老师进行交流、解答。

免费领取说明

1、培训券可兑换一门视频课程。

2、下载注册APP即可获得400培训券,签到、发帖讨论也可获取培训券。

3、鼓励学习,在线学习也可积累培训券。

4、兑换的课程与购买的为相同课程。

5、课程可在APP或者小程序进行学习。

亳州成人高考提升便捷服务

【2024亳州成考考试】

距亳州成考录取查询:预计

12/24/2024

亳州成考成绩查询入口 亳州成考预报名入口

【请各位考生提前备考!】

  • 考生交流群

  • 微信公众号

扫一扫加入微信交流群

与考生自由互动、并且能直接与专业老师进行交流、解答。

亳州考生在线服务

专升本咨询

高起专/本咨询

学校专业咨询

考前辅导咨询

复习礼包领取

报名入口

扫码立即关注公众号

扫码立即加入交流群

公众号

交流群

回到顶部

关闭